MOSCOW, September 10. /TASS/. The capacity of data centers connected to Russia's power grid stands at around 5 GW, with most of them located in Moscow and St. Petersburg, Russian Deputy Energy Minister Pyotr Konyushenko said in an interview with RBC TV. "Today, the capacity of data centers connected to the grid in Russia is around 5 GW.
Story intelligence
0 claims checkedMOSCOW, September 10. /TASS/. Russian President Vladimir Putin plans no news conference for the Kremlin pool on the outcomes of the upcoming BRICS summit in New Delhi, Russian Presidential Aide Yury…
MOSCOW, September 10. /TASS/. Russian President Vladimir Putin will address the BRICS Business Forum in India on Friday, September 11, and present initiatives for cooperation, Russian Presidential…
MOSCOW, September 10. /TASS/. The Ukrainian army lost roughly 1,430 troops in battles with Russian forces in all the frontline areas over the past 24 hours, according to the latest data on the…
MOSCOW, September 10. /TASS/. Russian President Vladimir Putin and Indian Prime Minister Narendra Modi will inspect the industrial achievements of Russia and India at the Innoprom exhibition on…
MOSCOW, September 10. /TASS/. The "imaginary threat" posed by a drone to Vladimir Zelensky’s plane at the Chisinau airport, Ukrainian provocations, and strikes on ships in the Black Sea were the main…
Trump jokes Republicans can ‘cheat like hell’ in the midterms NewsFeed Trump jokes Republicans can ‘cheat like hell’ in the midterms US President Donald Trump has jokingly asked Republican voters to…
MOSCOW, September 11. /TASS/. Russia will inevitably move to mandatory labeling of AI-generated content in the near future, Vladimir Tabak, president of the Global Fact-Checking Network (GFCN), told…
VOLGOGRAD, September 11. /TASS/. Two people have been hospitalized after a residential building in the Volgograd Region was damaged in a missile attack, Governor Andrey Bocharov said. "Last night, a…